{ "meta": { "l1": "Management", "l2": "Analysis Cost", "version": "1.0", "lastUpdated": "2026-01-26" }, "help_body": { "title": "Management / Analysis Cost", "desc": "Performance vs. Investment cost" }, "sections": { "image": "/arms/img/help/en/management-cost-section-3.jpg", "contents": [ { "index": 1, "title": "Investment cost and performance chart", "desc": [ "Visualizes the relationship between fixed labor costs and actual performance value by contrasting the total salary cost trend (blue line) with cumulative performance and cost (green area).", "Highlights periods of cost change by displaying sudden labor cost fluctuations or personnel changes as red bars on the chart.", "Separates historical execution data and future cost trends using the Today baseline, supporting interpretation of cost flow over time." ] }, { "index": 2, "title": "Detailed data information", "desc": [ "Presents cost and performance data from an investment perspective by structuring inputs and outputs using open and close concepts.", "Enables comparison between past performance accumulation and future estimated cost trends based on the Today reference point.", "Displays quantitative figures for each date such as date, performance baseline, performance and open, close, low and high values in a summary window when hovering over a specific data point." ] }, { "index": 3, "title": "Timeline range control", "desc": [ "Allows selection and zoom-in of specific analysis periods, such as quarterly or monthly ranges by adjusting the range slider at the bottom of the chart.", "Supports focused analysis of periods with intensive input or performance changes by narrowing the visible timeline within the overall project duration." ] } ] } }