{
   "meta": {
      "l1": "Management",
      "l2": "Analysis Time",
      "version": "1.0",
      "lastUpdated": "2026-01-26"
   },
   "help_body": {
      "title": "Management &#47; <strong>Analysis Time</strong>",
      "desc": "Requirement and linked issue timeline"
   },
   "sections": {
      "image": "/arms/img/help/en/management-time-section-6.jpg",
      "contents": [
         {
            "index": 1,
            "title": "Data range",
            "desc": [
               "Filters data within a maximum range of 30 days by designating the start and end dates for analysis.",
               "Analyzes update pattern changes around specific points through the data distribution of the selected period."
            ]
         },
         {
            "index": 2,
            "title": "Vertical timeline chart",
            "desc": [
               "Visualizes requirement and version update history occurring by date in descending order by arranging the flow of time on a vertical axis.",
               "Displays summarized version names, assignees and specific requirement change details of tasks performed on the date in each card element.",
               "Intuitively identifies work context at specific past points via the timeline and provides a reference for reviewing work continuity between versions."
            ]
         },
         {
            "index": 3,
            "title": "Requirement update status",
            "desc": [
               "Compares task concentration patterns at specific points by displaying update intensity for each requirement as a waveform.",
               "Precisely explores even minute update occurrence points by adjusting graph amplitude via the height adjustment slider at the top.",
               "Analyzes the duration and persistence of issue responses by comparing the waveform distribution of requirements and linked issues."
            ]
         }
      ]
   }
}
